Amazon SAX5

Los Angeles, CA

Architect: SCA Architecture
General Contractor: Big-D Construction
Project Size: 8.87-acres & 200,000 SF

Completed in early 2024, this advanced robotics distribution center reflects a strategic transformation of an existing facility into a high-performance, future-ready operation. Team ALBD delivered the full electrical scope, including a significant service upgrade from 2000A to 4000A, along with utility coordination to support seamless operations and integration of supplemental emergency generator power.

The renovation was designed to accommodate the unique demands of automated logistics, with infrastructure enhancements that support efficiency, safety, and scalability across the facility.

Project Features:

  • Service upgrade from 2000A to 4000A to support increased operational capacity
  • Utility coordination and integration of emergency generator power
  • Interior drive and delivery loop system for streamlined logistics
  • Expanded office and conference areas to support operational growth
  • Dedicated wellness space and remote restroom facilities
  • Battery charging infrastructure for robotics and equipment
  • EV charging stations supporting fleet electrification
  • Advanced lighting systems and integrated security controls

This project exemplifies a thoughtful approach to modernization—aligning infrastructure with evolving technologies and positioning the facility for continued innovation and performance.