El Toro Water District

Laguna Woods, CA

Architect: Hyde Engineering Services
General Contractor: ONEAL
Project Size: 3 acres

Project Features:

  • Integrate a 3300 KWH energy storage system to offset peak demand for the water district
  • ALBD coordinated the requisite shutdown with Southern California Edison and the water district for the tie-in of the new battery storage system
  • System was fueled by Tesla Lithium power pack batteries