La Sierra University Fitness Center

Riverside, CA

Architect: NAC Architecture
Contractor: Swinerton Builders
Project Size: .45 acres & 5,500 SF

ALBD is honored to have teamed up with La Sierra University and Swinerton Builders on this health-centric fitness center where all students and faculty wellness is bound to peak.

“The construction of a new fitness center and the replacement of our gym floor are important steps in aligning our athletics department with the overarching goal of fostering student and community development.” – Javier Krumm, Athletics Director

Project Features:

  • Our scope began at perimeter with all in-ground electrical components for site and building service.
  • From underground to vertical components complete with new transformer, switch gear, conduit, wiring, and circuitry, FLS systems, lighting controls, etc.
  • High-end lighting fixtures throughout.
  • All electrical elements for site lighting, wayfinding, and signage.
  • State-of-the art technology, equipment, WiFii, and media for maximum functionality for every fitness enthusiasts.

La Sierra’s University Fitness Center broke ground in Summer 2022 and opened for use during the first week of Fall Semester 2023.